Land Parcelling

Macobo draws up a comprehensive land development plan where the parcelling of the site into lots is done in the most practical and economical way. Naturally, the customer’s wishes are taken into account as much as possible within the town planning conditions. We provide a detailed survey plan for each lot. The necessary sewerage and road systems are designed and we provide the necessary documents for the building permit.


  • Mechelen, Otterbeek district
    Macobo Refentie Mechelen Wijk Otterbeek 3

    Macobo redesigned the Otterbeek district for VMSW (the Flemish Society for Social Housing). In addition to the design, we monitored the entire landscaping works: squares, car parks, green areas, sports fields, playgrounds and streets. It is a clearly defined district which comprises four different entities, each with its own structure. Our design took into account the fact that each entity has its own housing types.

    Read more
  • Heist-op-den-Berg, 45 council flats
    Macobo Refentie Heist-op-den-Berg, 45 sociale woningen

    Commissioned by VMSW (the Flemish Society for Social Housing) and in collaboration with architects’ firm Archiles, we are working on various designs: special systems, EPBD, structural engineering and landscaping. More specifically, the special systems analyses includes HVAC, plumbing, electrical wiring, lighting, renewable energies and heat loss calculation.

    Read more
  • Koersel, Aerdeweg land parcelling
    Macobo Referentie Koersel, Verkaveling Aerdeweg

    We were entrusted with designing the facilities surrounding a brownfield project for houses and apartment buildings commissioned by VMSW, the Flemish Society for Social Housing. The design involved laying footpaths and greenery and an existing forest was cleared and transformed into recreational woods. The footpaths support the spatial structure of the residential development and conduce to making it a safe area.

    Read more

Would you like a customised quote?

Just fill in the form and we will contact you within 5 working days